A complete bathroom renovation in Chingford, involving extensive floor excavation to accommodate new plumbing, underfloor heating, and proper leveling for a durable and modern finish.

Execution Time: 5 weeks
Completed Tasks:
  • Removed the severely damaged cement floor.
  • Excavated 20 cm to allow for the installation of all plumbing pipes.
  • Installed a modern underfloor heating system for added comfort.
  • Properly leveled the floor to ensure a smooth and stable foundation.
  • Completed the renovation with high-quality finishes for a sleek look.
Project Challenges:
  • The heavily damaged cement floor required deep excavation before any installation.
  • Precise plumbing placement was essential to fit within the newly created floor space.
  • Ensuring proper insulation and even heat distribution for the underfloor heating system.
Final Outcome:

The bathroom was transformed into a fully modernized space with a stable, well-insulated floor, efficient plumbing, and comfortable underfloor heating. The high-quality finishes provided a stylish and functional result, enhancing both durability and comfort.

A new Bathroom